Kuching Marathon

4 (3 Recensioner)
Kuching, Malaysia
27 okt, 2024 (sön)
Eventets storlek: 10000 - 24999 deltagare (Max 10000 deltagare)

Löpning

10 km, 21.097 km, 42.195 km

Tävlingar som erbjuds av detta event

Kuching Half Marathon

27 okt, 2024 (sön)
Löpning
21.097 km
Solo
På plats
Väg

Kuching 10 km

27 okt, 2024 (sön)
Löpning
10 km
Solo
På plats
Väg

Kuching Marathon

27 okt, 2024 (sön)
Löpning
42.195 km
42.47 km av höjdskillnaden
Visa bankarta
Solo
På plats
Väg

Recensioner

4
3 Recensioner
5
4
3
2
1
Skriv en recension
Ahotu-användare
okt 2024Löpning
21.097 km

I ran the Kuching Half Marathon 2024. 1. Race The race route was very hilly, which was expected from the race elevation shared, but it was tough to find actual gpx files to properly study the route. There was also limited information shared with registered participants ahead of time. We had to check the event’s Facebook page frequently for updates rather than its Instagram, which would’ve been more convenient. On race day, porta-potties along the route were scarce. At the finish line, sprinting to the end was nearly impossible due to a lack of proper barricades and even cars being allowed in—quite an oversight. Adding to the frustration, the route was 300 meters longer than the standard 21.1k, clocking 21.5k, which skewed my official race time. The finisher medal and shirt collection station was set up directly after the finish line, creating a messy queue that extended past the finish area. The disorganization here was noticeable, but I could tell volunteers were doing their best. 2. Expo I collected my race pack the previous day, and I spent about 70 minutes queuing, though I heard the earlier days saw lines as long as three hours. The process itself was straightforward enough with a QR code for confirmation, but the venue felt cramped. For the event size, it was too small—the collection line wound through the expo, looping around booths, making it difficult to shop or browse comfortably. I would not recommend this race to PR or for the smoothest, most hassle-free experience, but Kuching City is lovely, filled with character.

user avatar
Liow Sat Ling
Country flag of MY
sep 2022
42.195 km

It was my first FM. It started with everything smooth but when come to 21km, it started to rain, there's rain water everywhere on the road. Windy and heavy rain really challenging to my first FM.

Full marathon 42km

user avatar
Jeeridyne Chan
Country flag of MY
aug 2018
21.098 km

The route is quite flat but you get to enjoy views such as Malay villages, Historical buildings along the way and fresh air too. It's good that the run starts early so by the time we finish run, it's not hot yet. It would be nice if there's more cheerleaders along the way to cheer the runners.

Söker du inspiration och vill ha exklusiva erbjudanden?

Gör som tusentals andra och prenumerera på Ahotus nyhetsbrev!
Genom att prenumerera samtycker du till Ahotus användarvillkor och integritetspolicy.

Våra samarbetspartners

Partner logo
Partner logo
Partner logo
Sporter

Det pris som visas omvandlas till en ungefärlig kostnad i den valuta som du har valt. Växelkurserna kan ändras medan du slutför ditt köp. Kontrollera alltid med din utgivande bank för en exakt växelkurs.

© Ahotu är en tjänst och ett varumärke som ägs av World's Sports Group. Alla rättigheter är reserverade.

Version: 9.25.3